Category: Uncategorized
-
Exciting News: Tamagi Museum and Learning Centre Opening!
We are thrilled to announce the opening of the Tamagi Museum and Learning Centre from September 1st, 2024! Join us…
-
April 2024 Update: Steering Committee Meeting in Tamagi, CNT Expansion and Fiber Optic Network Connection
On Friday, April 12th, 2024, a much-awaited Tamagi Museum Learning Research Trust Steering Committee meeting was held at HQ in…
-
January 2024 Update: TMLC’s status as Trust (‘Guthi’) in the Nepali legal system has been established.
Establishing TMLC as a Trust within the Nepali legal system has been a priority for some time. A trust –…
-
May 2023 Update: Evaluation of trial runs in preparation for official opening.
Our main objective during the last two weeks has been gaining a better understanding of how the museum’s offerings (incl.…
-
March/April 2023 Update: Work on TMLC resumes after winter break.
Three of the four members of the Norwegian Team – Hem, Ellen and Arild – arrived in March to pick…
-
December 2022 Update: On track to scheduled opening!
After numerous delays due to the pandemic and illness, work on the TMLC and its surroundings is accelerating with a…
-
May 2022: Resuming preparations for opening of TMLC
Finally, after over two years in pandemic lockdown, we return to Tamagi to pick up where we left off. Arriving…
-
January 2021: COVID-19 Update
As mentioned in our last post nearly a year ago, our scheduled TMLC activities at Tamagi, Kaski were disrupted and…
-
March, 2020: Travel Update
Due to the COVID-19 pandemic, the much-anticipated visit of the Norwegian Mission to Nepal during the last two weeks of…
-
February, 2020: Progress report – Hem’s visit to Tamagi in November, 2019
The main objective of this visit was surveying the TMLC site’s physical configuration and staking out the boundaries separating property…